承攬工程實績
[1][2][3][4][5][6][7][8][9][10]




業主:中國石油股份有限公司煉製事業廠
Client:Chinese Petroleum Corp. Refining Business Division
工程名稱:高廠RDS工場E2004 A/B冷卻器製造工程
Job Description:Manufacturing of E2004 A/B condenser for CPC Kaohsiung RDS Plant
開工:2001.07.23
Commencement Date:2001.07.23
完工:2002.04.30
Completion Date:2002.04.30
備註:焊接前預熱
Remarks:Preheat before welding.






業主:中國石油股份有限公司煉製事業廠
Client:Chinese Petroleum Corp. Refining Business Division
工程名稱:高廠RDS工場E2004 A/B冷卻器製造工程
Job Description:Manufacturing of E2004 A/B condenser for CPC Kaohsiung RDS Plant
開工:2001.07.23
Commencement Date:2001.07.23
完工:2002.04.30
Completion Date:2002.04.30
備註:焊接完成、X-RAY完成後再做超音波檢測
Remarks:Conduct ultrasonic testing after welding and X-RAY testing.

業主:中國石油股份有限公司煉製事業廠
Client:Chinese Petroleum Corp. Refining Business Division
工程名稱:高廠RDS工場E2004 A/B冷卻器製造工程
Job Description:Manufacturing of E2004 A/B condenser for CPC Kaohsiung RDS Plant
開工:2001.07.23
Commencement Date:2001.07.23
完工:2002.04.30
Completion Date:2002.04.30
備註:與上層塔連接前先測水平之精密度
Remarks:Conduct a horizontal precision testing before linking to the upper tower.

業主:中國石油股份有限公司煉製事業廠
Client:Chinese Petroleum Corp. Refining Business Division
工程名稱:高廠RDS工場E2004 A/B冷卻器製造工程
Job Description:Manufacturing of E2004 A/B condenser for CPC Kaohsiung RDS Plant
開工:2001.07.23
Commencement Date:2001.07.23
完工:2002.04.30
Completion Date:2002.04.30
備註:焊接完成持溫以確保品質
Remarks:Keep the sintering temperature in order to ensure good quality after welding.

業主:中國石油股份有限公司煉製事業廠
Client:Chinese Petroleum Corp. Refining Business Division
工程名稱:高廠RDS工場E2004 A/B冷卻器製造工程
Job Description:Manufacturing of E2004 A/B condenser for CPC Kaohsiung RDS Plant
開工:2001.07.23
Commencement Date:2001.07.23
完工:2002.04.30
Completion Date:2002.04.30
特殊情形:水壓試驗壓力290kg/cm2 ,氣密試驗壓力:210 kg/cm2,本設備壓力高不易施工,瞉體鋼板材質:A266-2厚度68m/m。
Special Circumstances:Hydraulic test pressure:290 kg/cm2;airtight test pressure 210 kg/cm2 .High pressure contained in the machine might hinder the construction. The body shell steel:A266-2with thickness of 68m/m.