承攬工程實績
[1][2][3][4][5][6][7][8][9][10]


業主:中國石油股份有限公司石化事業部
Client:Chinese Petroleum Corp. Petrochemical Business Division
工程名稱:林園石化廠芳三組F6201加熱爐增設對流區工程
Job Description:Additioal convection section of F6201 heating furnace at CPC Linyuan Petrochemical Plant AG Group #3
開工:2002.01.17
Commencement Date:2002.01.17
完工:2002.05.30
Completion Date:2002.05.30
特殊情形:P-22及P-11合金鰭管。
Special Circumstances:P-22 and P-11 alloy finned tube.




業主:中國石油股份有限公司石化事業部
Client:Chinese Petroleum Corp. Petrochemical Business Division
工程名稱:林園石化廠芳三組F6201加熱爐增設對流區工程
Job Description:Additioal convection section of F6201 heating furnace at CPC Linyuan Petrochemical Plant AG Group #3
開工:2002.01.17
Commencement Date:2002.01.17
完工:2002.05.30
Completion Date:2002.05.30
特殊情形:1.爐壁製作完成後.用耐高溫1260℃一體成型之KAOWOOL FIBER 隔熱
2.完工後性能測試,外表溫度不得超過72℃。
Special Circumstances:
1.Insulate heat with KAOWOOL FIBER, which is resistant to 1260℃, after completion of furnace walls.
2.After completion of construction, the surface temperature cannot exceed 72℃.

.業主:中國石油股份有限公高雄煉油廠
Client:Chinese Petroleum Corp. Kaohsiung Refinery
工程名稱:桃園煉油廠第RDS工場空氣冷卻器及鋼構按裝工程
Job Description:Installation of air cooler and steel structure at CPC Taoyuan NO.2 RDS Plant
開工:1988.12.19
Commencement Date:1988.12.19
完工:1990.05.04
Completion Date:1990.05.04

業主:中國石油股份有限公高雄煉油廠
Client:Chinese Petroleum Corp. Kaohsiung Refinery
工程名稱:高雄廠第一異構化工場AIRCOOLER安裝工程(16SETS)
Job Description:Installation of air cooler for CPC Kaohsiung NO.1 Isomerization Plant(16SETS)
開工:1993.03.15
Commencement Date:1993.03.15
完工:1993.05.24
Completion Date:1993.05.24

業主:中國石油股份有限公高雄煉油廠
Client:Chinese Petroleum Corp. Kaohsiung Refinery
工程名稱:大林煉油廠重油轉化工場空氣冷卻器按裝工程(14SETS)
Job Description:Installation of air cooler for RFCC plant at Dalin Plant(14SETS)
開工:1990.02.10
Commencement Date:1990.02.10
完工:1990.10.13
Completion Date:1990.10.13

 


業主:中國石油股份有限公高雄煉油廠
Client:Chinese Petroleum Corp. Kaohsiung Refinery
工程名稱:大林煉油廠第十一蒸餾工場及第一異構化工場及第一異構化工場
AIR COOLER安裝工程(38SETS)
Job Description:Installation of air cooler for NO.11 topping plant and NO.1 isomerization plant at
Dalin Refinery (38 SETS)
開工:1993.08.25
Commencement Date:1993.08.25
完工:1995.02.14

Completion Date:1995.02.14